Aero atmospheric aerogel thermal insulation coating

Product Introduction

Aero atmospheric aerogel thermal insulation coating is mainly composed of special high-performance elastic emulsion, preferably SiO₂ aerogel as thermal insulation material, water as solvent, high performance thermal insulation material prepared by special process. A dense vacuum layer is formed on the surface of the coated material, which can effectively block the transmission of solar radiant heat and heat radiation in the air, and reduce the internal and external heat exchange of the coated material; The coating can effectively absorb sound waves and achieve the effect of attracting and reducing noise.

Product Features

Thermal Insulation

Formaldehyde Purification

Sound Insulation and Noise Reduction

Fire and Flame Retardant

Moisture and Condensation Protection

Product Application

Aero Atmosphere - Interior wall - cloudimpression.ae - cloud impression dubai

Interior Wall

Aero Atmosphere - Children's room - cloudimpression.ae - cloud impression dubai

Children's Room

Aero Atmosphere - Music room - cloudimpression.ae - cloud impression dubai

Music Room

Aero Atmosphere - basement - cloudimpression.ae - cloud impression dubai

Basement

Construction Description

Aero Atmosphere - Primary treatment - cloudimpression.ae - cloud impression dubai

1. Primary Treatment

Pre-construction inspection:

Water content and PH value of the bottom layer, water content < 10%, PH value less than 10;

Before construction, white latex should be painted and interior wall mesh cloth should be pasted.

Aero Atmosphere - Medium coating - cloudimpression.ae - cloud impression dubai

2. Medium Coating

Whisk:

Stir before construction, stirring time is not less than 5 minutes;

Construction process:

Scratch coating

Construction times:

≥2 times

Construction thickness: 2mm

Aero Atmosphere - Putty - cloudimpression.ae - cloud impression dubai

3. Putty

Polish:

Dust should be swept away after each piece of putty polishing, and the last piece of putty should be polished until smooth;

Construction process:

Scratch coating

Construction times:

2-3 times (each thickness does not exceed 1mm)

Aero Atmosphere - Primer - cloudimpression.ae - cloud impression dubai

4. Primer

Pre-construction inspection:

Water content and PH value of the bottom layer, water content < 10%, PH value less than 10;

Add water and mix:

Add 30% water to dilute, and mix well with electric mixing tools.

Construction process:

Roller coating, spraying

Construction times:

1 time

Aero Atmosphere - Top coating - cloudimpression.ae - cloud impression dubai

5. Top Coating

Add water and mix:

Add 10% water to dilute, and stir evenly with electric mixing tools;

Construction process:

Roller coating, spraying

Construction times:

≥2 times